Green Heat Network Fund: Rounds and Eligibility 2026

Updated 10 November 2026 · Round status, limits and Boiler Upgrade Scheme facts checked 10 November 2026 · SEO Dons Editorial

Send a short enquiry Name, phone and email. We reply by email.

The green heat network fund is the main government grant for low-carbon district heating in England and Wales, and it is one of the few funds that reaches commercial and public-sector projects at scale. This guide sets out where the green heat network fund stands on 10 November 2026, who is allowed to apply, what it pays for, the limits on a grant, and how to prepare for the next round.

It is written for developers, housing and estates teams, councils and building owners weighing up heat networks and ambient loops. If your building only needs a heat pump of its own rather than a shared network, the later sections explain which routes to use instead. Our wider overview of commercial heat pump grants covers every scheme we track, with open and closed status shown by date.

Send an enquiry about a commercial heat pump

Send an enquiry and we reply by email. This site is not an installer and gives no price.

  • 1. You send the form with the building and funding details you know.
  • 2. We reply by email with the funding routes that may fit and the evidence to prepare.
  • 3. This site is not an installer: it quotes no price and carries out no surveys.

By submitting you agree to our privacy policy. We reply by email.

Green Heat Network Fund status at 10 November 2026

No round is open. We read three official sources on 10 November 2026: the GOV.UK Green Heat Network Fund page (last updated 10 June 2026), the Round 12 Guidance for Applicants (version 12.0) published there, and the delivery partner’s application page.

  • Round 12: closed at 11.59pm on 25 September 2026. The delivery partner’s page says Round 12 has now closed for applications. The GOV.UK page has not been updated since June and still words the round as open; the closing date it gives has passed.
  • Round 13: the guidance gives a final submission date of 23 April 2027, marked provisional, and says the funding allocated at Rounds 12 and 13 is subject to government approvals.
  • Round 11: closed at 11.59pm on 1 May 2026.
  • Rhythm: the guidance says main rounds are intended to take place roughly twice a year.
  • Budget: the guidance says the fund began at £288 million and that in January 2026 the government confirmed £195 million a year until 2029/30. GOV.UK says funding can be drawn down until the 2029 to 2030 financial year.
  • Geography: England and, from Round 12, Wales.
  • Delivery partner: Triple Point Heat Networks Investment Management, which handles enquiries and takes sign-ups for notice of Round 13.

Treat 23 April 2027 as a planning date, not a promise: it is provisional, and the guidance says submission dates can change. If you have a single building and no network, skip to the Boiler Upgrade Scheme.

For what an award looks like on the ground, the fund gave Bradford Energy Limited £20 million in May 2023 for an air source heat pump network and almost £10 million more in September 2026 to extend it. Our guide to commercial heat pump grants in Bradford covers what that means for city centre buildings, and the Liverpool guide covers a city where a heat network zone is being drawn.

What the Green Heat Network Fund pays for

GHNF supports the building of new low-carbon heat networks, including networks that also provide cooling. It also supports the retrofit and expansion of existing heat networks, for example connecting more buildings to a network that already runs or upgrading its heat source to a low-carbon one.

In practice that means the fund is aimed at shared heating infrastructure: a central energy centre, the pipework that carries heat between buildings, and the low-carbon heat source such as a large heat pump. It is not a fund for replacing the boiler in a single shop, office or care home. gov.uk describes GHNF as a core element of the Heat Network Transformation Programme, which is the wider government effort to grow and regulate heat networks.

Grant limits and the tests a project must pass

The figures below come from the Round 12 Guidance for Applicants, read on 10 November 2026. The guidance calls them the absolute scheme limits and says most projects are expected to do significantly better than them to score well. A later round can change them.

Green Heat Network Fund limits and gated metrics in the Round 12 guidance
TestLimit in the Round 12 guidance
Share of costThe grant is up to, but not including, 50% of the estimated eligible commercialisation and construction costs
Grant per unit of heatNo more than 4.5p of grant per kWh of heat delivered to customers over the first 15 years of operation
Minimum demandUrban networks: end customer demand of at least 2 GWh a year. Rural, off-gas-grid networks: at least 100 dwellings connected. Both within five years of the first connection
Carbon100 gCO2e per kWh of thermal energy delivered, or lower
Social returnA social internal rate of return of 3.5% or more over 40 years
Customer priceDomestic customers and micro-businesses must not be offered a heat price above the comparison the guidance sets: low carbon heating for new buildings, gas or oil for existing ones
Commercialisation supportNot normally more than £1 million

The guidance lists the heat sources it treats as proven. They include ground, water, air, sewer and mine-source heat pumps, waste heat from an industrial or commercial process upgraded by a heat pump, distributed heat pumps on a centrally managed ambient loop, and deep geothermal.

The fund also has to be additional. The guidance says funding is not normally treated as additional where customers are already legally required to connect, for example under a Section 106 agreement or a future zoning obligation, or where the network would earn an acceptable return without a grant.

Who can apply for GHNF

Public, private and third-sector organisations can apply. That includes local authorities, housing providers, commercial developers, energy service companies and charities that are developing or operating a heat network.

Individuals, households and sole traders cannot apply. If you are a sole trader running a workshop, or a homeowner, GHNF is not a route for you, and you should look at the schemes in the section on buildings without a network below.

The project must be in England or Wales; the Round 12 guidance says Wales joined from Round 12. It lists public sector organisations including NHS trusts and universities, private sector organisations that are registered companies and submit annual accounts, and third sector organisations such as registered charities.

How to prepare between rounds

Because windows have fixed deadlines, the work that decides success happens before a round opens. Teams that wait for the announcement to start usually find the time between opening and closing too short for a project with several stakeholders.

A sensible preparation sequence looks like this. It is general project preparation rather than a statement of the scheme rules, so check each item against the guidance when a round is published.

  • Define the network: which buildings connect, who owns the pipework and the energy centre, and who will operate it.
  • Gather heat demand data for each connected building, ideally from at least a full year of metered gas or heat use.
  • Commission a feasibility or options study so the choice of heat source, such as an air source or water source heat pump, is evidenced.
  • Agree the land, access and wayleave position for the energy centre and the pipe routes.
  • Build a financial model showing capital cost, running cost, heat sale income and what you would do without a grant.
  • Line up the other funding and the investment decision-makers, so that match funding is not a surprise at the deadline.
  • Register for gov.uk updates and contact the delivery partner, Triple Point Heat Networks Investment Management, to ask when guidance for the next round is expected.

Existing networks: the Heat Network Efficiency Scheme

If you already run a district heating network or a communal heating system, the relevant fund is usually not GHNF but the Heat Network Efficiency Scheme (HNES). Per gov.uk, HNES gives grant funding to existing operational district heating networks and communal heating systems in England and Wales, to part-fund performance improvements and optimisation studies.

Public, private and third-sector applicants can apply. The gov.uk overview gives revenue grants of up to £2 million (2023 to 2025) for third-party optimisation studies, and capital grants of up to £75 million across 2023/24 to 2027/28. The August 2026 guidance also records an additional £30 million of capital awarded in January 2026.

On gov.uk (updated 12 October 2026), Round 13 has closed and applications for Round 14 are expected to open on 30 November 2026, subject to budget availability, so plan the evidence now. A good first step for an operator is a metered performance review of the existing network, because that evidence supports either an optimisation study or a capital improvement application.

If you have no heat network: the Boiler Upgrade Scheme

Most commercial buildings are not on a heat network. For those, the Boiler Upgrade Scheme (BUS) is the first scheme to check. GOV.UK says the grant can replace a heating system in a home or a building used for a business, in England and Wales.

The grant is £7,500 towards an air source (air-to-water) or ground source heat pump, water source included, and £5,000 towards a biomass boiler. Until 31 March 2027 that rises to £9,000 (£1,500 more) where the property is heated by oil or LPG and has no mains gas connection. Ofgem lists the £2,500 air-to-air grant for residential properties only.

The size limits on GOV.UK are 45 kWth for one system, 70 kWth where a heat pump is installed with one or more further heat pumps, and 300 kWth for a shared ground loop. The applicant must own the property and be replacing fossil fuel heating, and hybrid systems are excluded. An MCS-certified installer applies on the owner’s behalf and the grant comes off the price.

The rules by type of heat pump and type of organisation are on our commercial air source heat pump grant page, checked on 10 November 2026.

Capital allowances for the part the business pays for

Whatever grant you win, most of the cost of a heat pump or network connection is still paid by the business. The Annual Investment Allowance and other capital allowances (AIA), which is £1 million a year, are tax reliefs on qualifying plant and machinery. They apply to the cost the business funds itself, so a grant reduces the qualifying spend.

Do not assume that different allowances can be added together on the same spend. Ask your accountant to confirm which relief applies to the project and how any grant is treated. Our cost guide explains how to build the full capital cost so you know what your accountant has to work with.

Funds that are closed: IETF and PSDS

Two funds that heat pump projects were once pointed towards are not available. The Industrial Energy Transformation Fund (IETF) is closed: gov.uk guidance lists it as closed from July 2025, there is no further extension after the Spending Review, no successor fund is planned, and the second Phase 3 window was cancelled. Projects already funded in earlier phases continue.

The Public Sector Decarbonisation Scheme (PSDS) is also closed to new applications. Its Phase 4 window closed on 25 November 2024, and government has committed no further PSDS investment beyond projects already awarded, according to a Parliamentary written answer of 20 October 2025 and Salix Finance. If a supplier tells you either fund is open, ask for the gov.uk page that says so.

Common mistakes

The first is applying for the wrong fund: a single-building heat pump belongs in BUS territory, a new multi-building network belongs in GHNF territory, and an existing network belongs in HNES.

The second is treating a closed round as a pause that will reopen on a known date. Plan the project so it can proceed, or be re-scoped, without GHNF. The third is leaving evidence gathering until the deadline, particularly heat demand data and land agreements. The fourth is buying equipment before eligibility is confirmed, which can rule out a BUS voucher or weaken a funding case.

What to ask an installer or developer

Use these questions when you speak to an MCS installer for a single building, or to a heat network developer for a shared scheme.

  • Is my building eligible for BUS, and will you confirm that in writing before any work starts?
  • Is the system within the 45 kWth limit for one system, or does the 70 kWth multi-unit or 300 kWth shared ground loop limit apply?
  • Are you MCS certified, and will you apply for the voucher on my behalf?
  • Does the quote show the grant as a separate line, so I can see the net cost I am paying?
  • How long is the voucher valid once it is issued, and does the installation programme fit inside it?
  • For a network: who owns and operates it, and what happens to heat prices and maintenance after year one?
  • What is the plan if the grant route closes before we submit?

Where to go next

If you are developing a network, start preparing now and watch gov.uk for the next round. If you operate one, check HNES. If you have a single building, work through BUS and capital allowances with your installer and accountant. Send an enquiry and we reply by email.

Frequently asked questions

Is the Green Heat Network Fund open?

No round is open on 10 November 2026. Round 12 closed at 11.59pm on 25 September 2026. The Round 12 guidance lists Round 13 with a final submission date of 23 April 2027, marked provisional and subject to government approvals. The delivery partner, Triple Point Heat Networks Investment Management, takes sign-ups for notice of the next round.

Who can apply for the Green Heat Network Fund?

Public, private and third-sector organisations can apply for projects in England and Wales. Individuals, households and sole traders cannot. The fund supports new low-carbon heat networks, including cooling, and the retrofit and expansion of existing networks. Check the gov.uk guidance for the full eligibility rules when a round opens.

How much does the Green Heat Network Fund pay?

Under the Round 12 guidance the grant is up to, but not including, 50% of eligible commercialisation and construction costs, and no more than 4.5p per kWh of heat delivered over the first 15 years. The guidance calls these the absolute limits and expects most projects to ask for less.

What is the difference between GHNF and HNES?

GHNF supports new low-carbon heat networks and the retrofit and expansion of existing ones. HNES, per gov.uk, funds performance improvements and optimisation studies for existing operational district heating networks and communal heating systems in England and Wales. Operators of working networks should check HNES first.

Can a single building get a grant if it is not on a heat network?

Possibly, through the Boiler Upgrade Scheme in England and Wales. GOV.UK says the grant can be used in a building used for a business: £7,500 towards an air-to-water or ground source heat pump of up to 45 kWth for one system. The applicant must own the property and be replacing fossil fuel heating.

Are IETF and PSDS still available?

No. gov.uk guidance lists the Industrial Energy Transformation Fund as closed from July 2025, with no successor planned. The Public Sector Decarbonisation Scheme Phase 4 window closed on 25 November 2024, and government has committed no further investment beyond projects already awarded. Do not plan a new application around either.

Can I claim capital allowances on a heat pump?

The Annual Investment Allowance, which is £1 million a year, and other capital allowances are tax reliefs on qualifying plant and machinery. They apply to the cost the business funds itself, so a grant reduces the qualifying spend. Confirm how they apply to your project with an accountant before you commit.